Solar panels and solar collectors for pool heating in Dundaga.
The project was implemented in 2016.
Solar panels and solar collectors for pool heating in Dundaga.
The project was implemented in 2016.
Object type: Private house
Location: Salaspils
Solar collector application: Heating and water heating
Number of solar collectors: 8 pcs.
Solar collector area: 16.2 m2
Solar unit power: 11.5 kW
Heat pump power: 13kW
The system has been operating since 2017
Implemented: July 2012 / with CCFI 75% co-financing.
System: Thermo|Solar 24 pcs. TS500 flat solar thermal collectors.
Total system power: 43,872 kW
Realized: summer 2007.
System: 4 flat solar collectors TS300, solar boiler, automation, other accessories.
Implemented: July 2012 / with CCFI 75% co-financing.
System: Thermo|Solar 36 pcs. TS500 flat solar thermal collectors, 3 HSK1500 hygienic accumulation tanks.
Total system power: 65,808 kW
Realized: May 2012
System: Thermo|Solar 3 pcs. TS330 solar collectors, solar boiler 300 liters, other system elements.
A solar panel microgenerator for a mansion in Pinki was installed to ensure the most energy-efficient functioning of building systems.
The mansion has air quality maintenance, swimming pool recirculation and water treatment systems, all of which consume a significant amount of electricity.
Solar panels for a new building in Salaspils region were installed with the aim to save electricity in the summer months by providing electric water boiler heating, which is also used for heating the bathroom floor. Six solar panels provide up to two kilowatts of electricity on sunny summer days, which in this project is not connected to public networks at all.
In this object, next to the private house, there is a farm building with a large roof area, which was never used before. Therefore, the landlord decided to install solar panels to generate electricity for self-consumption. This was also done thanks to the work of our specialists.
A solar panel microgenerator for the motel in Valmiera was installed on the roof of the farm building to reduce electricity costs.
A variety of electrical appliances operate daily in the motel’s rooms, providing guests with comfort. These include air conditioners, office and kitchen equipment, and exercise machines and washing machines.
There are several buildings in the Tērvete social care center, between which there is a canteen with a large roof area, which was never used before. Therefore, the management of the institution, attracting state funding, decided in 2011 to install a solar battery system by implementing an appropriate project.