Realized: March 2013
System: Thermo|Solar 5 pcs. TS500 flat solar collectors, etc. system elements.
System power: 9.11 kW
Realized: March 2013
System: Thermo|Solar 5 pcs. TS500 flat solar collectors, etc. system elements.
System power: 9.11 kW
Realized: May 2013
System: Thermo|Solar 3pcs. TS300 flat solar collectors, solar boiler 300L, other system elements.
System power: 4,137 kW
Realized: July 2014
System: Thermo|Solar 10 TS400 flat vacuum solar collectors, heat pump DUO 2.5kW, other system elements.
System power: 14.48kW
A solar panel microgenerator for a private house in Bergi was installed to reduce daily electricity bills.
This project was especially interesting because the roof structure was designed in an architecturally unusual style. Therefore, several roof planes had to be used to accommodate the number of panels needed to reach the planned capacities.
By implementing the planned improvements of the heating and electricity generation systems in the guest house "Zaļā sala", the energy efficiency of the buildings was significantly increased and the stability of the functioning equipment was ensured. The project is interesting in that it installed both a solar panel and a solar collector system at the same time.
A solar panel microgenerator for a mansion in Pinki was installed to ensure the most energy-efficient functioning of building systems.
The mansion has air quality maintenance, swimming pool recirculation and water treatment systems, all of which consume a significant amount of electricity.
Realized: April 2010.
System: For heating support and hot water. 6 Flat vacuum Thermo|Solar collectors, solar boiler, heat storage tank, etc.
The solar panel system for the administrative building in Ragana was installed as one of the energy efficiency measures together with the insulation of the building.
There is also a culture house in the premises of the administrative building. Not only creative teams work on it every day, but also various electrical devices that provide visitors and performing artists with the most comfortable conditions for creative processes.
Object type: Private house
Location: Salaspils
Solar collector application: Heating and water heating
Number of solar collectors: 8 pcs.
Solar collector area: 16.2 m2
Solar unit power: 11.5 kW
Heat pump power: 13kW
The system has been operating since 2017
Solar panels and solar collectors for pool heating in Dundaga.
The project was implemented in 2016.
Implemented: July 2012 / with CCFI 75% co-financing.
System: Thermo|Solar 24 pcs. TS500 flat solar thermal collectors.
Total system power: 43,872 kW
Solar panels for a new building in Salaspils region were installed with the aim to save electricity in the summer months by providing electric water boiler heating, which is also used for heating the bathroom floor. Six solar panels provide up to two kilowatts of electricity on sunny summer days, which in this project is not connected to public networks at all.